Install
Please confirm you are human
This browser or connection looks automated. Press and continuously hold the control for 3 seconds to enable Google-hosted web results and, when separately allowed, AI-assisted answers.
A successful check enables 100 search requests. Interactive access does not authorize scraping, systematic collection, or reuse of search output.
News
Facade Takes Shape at 12-Story Residential
4+ day, 14+ hour ago (396+ words) Another ZD Jasper project is taking shape at 430 W. 37th (aka 430 W. 36th) where exterior framing and curtain wall installation has begun on a similarly massed residential project on the western side of the Lincoln Tunnel Underpass. Archimaera, again, the design architect of the…...
Topped Out 566 West Van Buren Adds First Panes Of Glass
5+ day, 23+ hour ago (205+ words) Chicago YIMBY Now and then, the first panes of glass show up at a construction site, only to be removed and replaced by a different style of cladding. But the first level of curtainwall at 566 West Van Buren wraps around…...
Facade Work Ongoing at 20-Story Luxury Condo Tower in Lenox Hill
1+ week, 4+ day ago (392+ words) Scaffolding has been erected where heavy-gauge framing now outlines future window openings at 260 E. 72nd Street, a new two-building structure, by Sky Equity Group and the mysterious Chetrit Group, directly above the platform of the 2nd Ave & 72nd St. stop of the Q line…...
Facade Work Ongoing at 20-Story Luxury Condo in Lenox Hill
1+ week, 4+ day ago (386+ words) Scaffolding has been erected where heavy-gauge framing now outlines future window openings at 260 E. 72nd, a new 2-building structure, by Sky Equity Group and the mysterious Chetrit Group, directly above the platform of the 2nd Ave & 72nd St. stop of the Q line in…...
Facade Work Nearly Complete on 39-Story Mixed-Use Residential Tower
1+ week, 4+ day ago (313+ words) Installation of facade masonry has reached the penthouse levels at 175 E. 82nd Street, where 73 luxury condominiums are now rising in the form of a 39-story high-rise development on the Upper East Side.The 478-foot-tall project is being developed by Douglaston Development and…...
Facade Work Nearly Complete on 35-Story Mixed-Use Residential Tower
1+ week, 5+ day ago (313+ words) Installation of facade masonry has reached the penthouse levels at 175 E. 82nd Street, where 73 luxury condominiums are now rising in the form of a 35-story high-rise development on the Upper East Side.The 492-foot-tall project is being developed by Douglaston Development and…...
Facade Work Ongoing at 22-Story Luxury Residential Tower Near Central Park
2+ week, 2+ day ago (167+ words) Facade work is on-going and approaching the penthouse level at 1122 Madison Avenue, where Legion Investment Group and Nahla Investments are responsible for developing a 22-story luxury residential project one block from Central Park on the Upper East Side. The 133,000-square-foot,…...
Pre-Leasing Launches For 342-Unit Lakeview At Nomi In North Miami
3+ week, 2+ day ago (160+ words) By: Oscar Nunez 7:30 am on August 21, 2026 Lakeview at Nomi will offer one-, two-, and three-bedroom apartments ranging from approximately 605 to 1,245 square feet, including select layouts with dens, as well as four live-work residences spanning approximately 1,280 to 1,915 square feet. Interiors will…...
Revised look emerges for resi tower at 8844 Burton Way in Beverly Hills
3+ week, 3+ day ago (182+ words) A staff report to the Beverly Hills Architectural and Design Commission offers a look at an updated design for a proposed high-rise apartment tower at 8844 Burton Way. The proposed project from Crescent Heights, approved earlier this year for a currently…...
Gallery of TP-LINK LXD Building / KPF - 22
3+ week, 6+ day ago (30+ words) ArchDaily TP-LINK LXD Building / KPF Linha House / Ricardo Azevedo Arquitecto New Headquarters Office Building for IAPSER / Sebastian Stechina + Carlos Di Napoli + Andres Francesconi...